Yes, under Municipal Code Chapter 13.05. An inspection is triggered by a new sewer connection, a building permit over $75,000 or affecting 25 percent or more of the structure, adding a toilet, a change of use, or a sanitary sewer overflow. Property owners are responsible for both the upper and lower lateral, and repairs must be finished within 90 days of a failed inspection.